|
Construction Of Samarahan – Sejingkat Bridge |
Posted on : 31 Mar 2022
|
A briefing was given by Jabatan Kerja Raya Sarawak (JKRS) on 31/03/2022. The main points are as follows:
- The construction of the bridge is expected to complete on 08/05/2025; and
- From 16/06/2024, only vessels with an air draught of less than 26 metre would be able to pass under the bridge (final segment).
The expansion of Senari Terminal (Phase 1 – Vehicle Yard construction) will commence in about 4Q 2022.
|
|
|