Sarawak ID | Register
Polls
Announcements

News

Construction Of Samarahan – Sejingkat Bridge
Posted on : 31 Mar 2022
 

A briefing was given by Jabatan Kerja Raya Sarawak (JKRS) on 31/03/2022.  The main points are as follows:

 

  1. The construction of the bridge is expected to complete on 08/05/2025; and
  2. From 16/06/2024, only vessels with an air draught of less than 26 metre would be able to pass under the bridge (final segment).

 

The expansion of Senari Terminal (Phase 1 – Vehicle Yard construction) will commence in about 4Q 2022.